Scope: Plumbing, Gas Piping, Plumbing BIM Modeling
General Contractor: FCI
New 62 unit senior living apartment building located in Grand Junction. Each unit is individually gas metered creating an intensive scope for gas piping. A parking garage located in the basement housed all of the piping mains. A 12” think post-tension cable slab separated the parking garage from the residential units. In house Bim coordination was utilized to locate where all piping would be suspended in the basement.
Article from product company used on project: https://www.viega.us/en/resources/blog/blog-posts/project-spotlight-cookeys-mechanical-grand-project-grand-junction.html